Highlights

Project Name:

ST. PETERSBURG 110/10KV PREFABRICATED SUBSTATION IN CIS COUNTRIES

Project Time:

2018

Project Introduction:

This project is located at the 110 substation in St. Petersburg, CIS region, and is TGOOD's first prefabricated modular substation project in CIS countries. The overall equipment of the project complies with local certification requirements, ensuring the compliance and reliability of the equipment locally. The modular design of prefabricated substation significantly shortens the construction cycle and enables quick response to project requirements. At the same time, the plan fully considers the harsh temperature conditions and other construction environmental requirements in the local area, ensuring that the substation can operate stably in extreme weather conditions..